Recent Projects

TCM Civil works throughout Newcastle, Hunter & Lake Macquarie

Veolia Amenities Building Remediation Toronto WWTP

Client: Veolia Water Operations

Design and detail precast sleeper retaining wall at Toronto WWTP

Excavation and piering of galvanised posts, install precast concrete sleepers, backfill retaining wall

Minor grading works around the edge of the building to allow water to fall away from the structure

Three months post construction, resin injection to level the building slab

Muswellbroook Supply & Installation of Water Distribution Points at Denman & Muswellbrook

Client: Muswellbrook Shire Council

Install two water dispensing units to allow access to bulk water 24 hours per day 7 days per week from convenient locations at Muswellbrook and Denman.

Excavation of concrete slab and kerb at Denman and construction of new pipeline for both sites into the proposed water units.

Installation of ancillaries including light posts and signage

Muswellbrook Design and Construction of Sewer Rising Main No.5

Client: Muswellbrook Shire Council

Detailed design and construction of 1.2km of DN 300 PVC-O PN16/ DN 315 PE 100 PN16 sewer rising main

HWC CDU Network Upgrade – Delivery Bunds and Dosing Points

Client: Hunter Water Corporation

Construction of delivery bunds and dosing points 11 Principal sites across the Hunter Region.

Excavations and earthworks including access construction

Demolition of any existing concrete structures and removal of rubble to approved waste facility.

Supply and Install of concrete slab materials

Concrete placement and finishing

Supply and install of handrails

Supply and connection of drain from bund sumps 

Construction of retaining walls 

Cabonne SC Construction of Water Reticulation System

Client: Cabonne Shire Council

Construction of Cumnock and Yeoval Water Reticulation Pipelines and Associated Structures.

Reticulation main from Yeoval reservoir to Yeoval town, 0.96 km long DN200 PVC-M pipeline.

Reticulation pipelines at various locations within Cumnock town. DN100 PVC-M pipes and have a total length of approximately 1.1 km.

Reticulation pipelines at various locations within Yeoval town. 2.5 km of DN100 PVC-M pipes and 0.5 km of DN150 PVC-M pipes