Recent Projects

TCM Civil works throughout Newcastle, Hunter & Lake Macquarie

Wine Country

The Hill

Cessnock Treatment Works

Awaba Waste Management Leachate Pump Station

Lake Macquarie City Council

Part of the expansion of the Awaba Waste Management Facility.  TCM was contracted to construct

    3,412 m of DN140/DN90 HDPE rising main

    Install two new DN160 gravity incoming lines

    1.2m x 1.2m x1.2m flowmeter/dosing pit with trafficable lid and flowmeter

    1.2m diameter actuated valve chamber

    1.8m diameter package pump station with intergral valve 80mm nominal diameter discharge pipework, valves and fittings

Cessnock / Kurri Kurri WWTW Ponds Refurbishment

Hunter Water Australia

Removal and transport of 7000 cu.m filter media from Kurri Kurri WWTW to Cessnock WWTW, placement of the filter media around the ponds at Cessnock WWTW and refurbishment of the nominated areas at Kurri Kurri WWTW.

Demolition and restoration work for the refurbishment of the redundant filter beds at the Kurri Kurri WWTW.