Wine Country
Lake Macquarie City Council
Part of the expansion of the Awaba Waste Management Facility. TCM was contracted to construct
3,412 m of DN140/DN90 HDPE rising main
Install two new DN160 gravity incoming lines
1.2m x 1.2m x1.2m flowmeter/dosing pit with trafficable lid and flowmeter
1.2m diameter actuated valve chamber
1.8m diameter package pump station with intergral valve 80mm nominal diameter discharge pipework, valves and fittings
Hunter Water Australia
Removal and transport of 7000 cu.m filter media from Kurri Kurri WWTW to Cessnock WWTW, placement of the filter media around the ponds at Cessnock WWTW and refurbishment of the nominated areas at Kurri Kurri WWTW.
Demolition and restoration work for the refurbishment of the redundant filter beds at the Kurri Kurri WWTW.